Range Renovations 2015

2015 saw the members of Dudley Rifle Club replacingrenovating the butts to be more in line with guidance, adding doors for inspections along with replacing the steelwork and linatex.

The work on the butts and target frames took 2 weeks to complete during May.

In September 2015, 4 months after the butt work, we got another work party together and painted the entire length of the range, walls, roofing beams and floor, we also painted the toilets, made repairs to plumbing and painted the club room, as well as clearing some of the overgrowth from the front of the building and entryway.
Last Updated 08/09/2015

  • Club Room Being Painted Sept 15
 © Ste Gough
  • Club Room Being Painted Sept 15
 © Ron Gough
  • Mens Toilet Being Painted
 © Ron Gough
  • Ladies Toilet Being Painted Sept 15
 © Ste Gough
  • Preparation Room Ceiling Painting Sept 15
 © Ron Gough
  • Preparation Room Ceiling Painting Sept 15
 © Ron Gough
  • Range Floor Painted Sept 15
 © Ron Gough
  • Range Floor Painted Sept 15
 © Ste Gough
  • Range Floor Painted Sept 15
 © Ron Gough
  • Butts after Renovation and 4 months shooting
 © Ron Gough
  • Members Painting The Range Sept 15
 © Ron Gough
  • Members Painting The Range Sept 15
 © Ron Gough
  • Members Painting The Range Sept 15
 © Ron Gough
  • Members Painting The Range Sept 15
 © Ron Gough
  • Range Floor Painted Sept 15
 © Ste Gough
  • Painted Roofing Beams Sept 15
 © Ste Gough
  • Painted Walls and Roofing Beams Sept 15
 © Ste Gough
  • Members Painting The Range Sept 15
 © Ste Gough
  • Painted Target Boards in Place, Job Done.
 © Ste Gough
  • Target Areas Marked with Hazard Tape
 © Ste Gough
  • Linatex Hung
 © Ste Gough
  • Inspection Door Fixing
 © Ste Gough
  • Target Boards Fixtures from Behind
 © Ste Gough
  • Target Boards in Situ
 © Ste Gough
  • A lick of paint makes all the difference
 © Ste Gough
  • Work in progress from the firing point
 © Ste Gough
  • Electrical Wiring Re-routed
 © Ste Gough
  • Members fitting woodwork
 © Ste Gough
  • Members fitting woodwork
 © Ste Gough
  • Additional Plates added in target area
 © Ste Gough
  • Upper Steelwork Lifted into place This was HEAVY
 © Ste Gough
  • Bottom half of steelwork completed
 © Ste Gough
  • Steelwork being fitted - Double Thickness as opposed to previously.
 © Ste Gough
  • Making Room in the floor trench for thicker steelwork.
 © Ste Gough
  • Fixing New Steelwork to the Wall
 © Ste Gough
  • Re-fitting the Linatex Fittings to be re-hung
 © Ste Gough
  • Removing Linatex Curtain Fixings to be reused
 © Ste Gough
  • Lead Removal and old steel in situ
 © Ste Gough
  • New Linatex cut to size
 © Ste Gough
  • Cleared out Lead from the Butts
 © Ste Gough